Natel was selected to conduct a design feasibility study to assess the benefits of retrofitting existing turbines at the St. Lawrence-FDR Power Project with FishSafe™ RHTs.
Natel Energy is announces the commencement of a feasibility study conducted for Patriot Hydro for retrofitting the Garvins Falls Hydropower Project with Restoration Hydro Turbines (RHTs).
Natel co-founder Gia Schneider talks to host Dunya Jovanović about why the hydropower industry needs FishSafe turbines to adapt to a changing planet.