2021 was a year of validation, bracketed by certifying our Freedom Falls plant as a Low Impact Hydro Installation, and by a suite of successful through-turbine fish passage tests in Q4.
In 2019 Tony Grassi, owner of The Mill at Freedom Falls, partnered with Natel to install the first Restoration Hydro Turbine.
Gia talks with Tough Tech Summit from The Engine.
In September 2021, Natel conducted formal testing with PNNL on a cohort of American eel passing through the RHT.
In September 2021, Natel worked with Kleinschmidt Associates on a through-turbine test of juvenile alewife.