PRESS

Natel Energy Q4 2021 Newsletter

January 5, 2022

Looking back on the past year and forward to the next, our team has a lot to be thankful for, and a lot of work ahead. For Natel, 2021 was a year of validation — bracketed by certifying our Freedom Falls plant as a Low Impact Hydro Installation at the start of the year, and by a suite of successful through-turbine fish passage tests in collaboration with Kleinschmidt Associates and Pacific Northwest National Lab in Q4 2021. Partnerships like these underscore our commitment to prioritizing positive ecological outcomes alongside reliable, renewable energy production.

More Stories

Podcasts

Abe Schneider Featured on Hardware to Save a Planet Podcast

Abe talks FishSafe turbines and the potential for distributed hydropower with Synapse's Head of Climate Tech Business, Dylan Garrett.

Announcements

Patriot Hydro selects Natel to conduct feasibility study for FishSafe™ retrofits at Garvins Falls

Natel Energy is announces the commencement of a feasibility study conducted for Patriot Hydro for retrofitting the Garvins Falls Hydropower Project with Restoration Hydro Turbines (RHTs).

Press

Natel is Featured in the WPTO's 2021-2022 Accomplishments Report for Three Different Projects

Natel Energy is featured in the Water Power Technology Office 2021-2022 Accomplishments Report for three different projects! Read more on pages 13, 16, and 17.