PRESS

Natel Energy Q4 2021 Newsletter

January 5, 2022

Looking back on the past year and forward to the next, our team has a lot to be thankful for, and a lot of work ahead. For Natel, 2021 was a year of validation — bracketed by certifying our Freedom Falls plant as a Low Impact Hydro Installation at the start of the year, and by a suite of successful through-turbine fish passage tests in collaboration with Kleinschmidt Associates and Pacific Northwest National Lab in Q4 2021. Partnerships like these underscore our commitment to prioritizing positive ecological outcomes alongside reliable, renewable energy production.

More Stories

Press

Factor This covers study demonstrating high survival for rainbow trout through Natel FishSafe™ turbine

Factor This reported on the recent peer-reviewed paper demonstrating 98.6-100% immediate survival for adult rainbow trout passing downstream through a FishSafe™ turbine.

Announcements

Patriot Hydro selects Natel to conduct feasibility study for FishSafe™ retrofits at Garvins Falls

Natel Energy is announces the commencement of a feasibility study conducted for Patriot Hydro for retrofitting the Garvins Falls Hydropower Project with Restoration Hydro Turbines (RHTs).

Press

Hydro Review: Commercializing a New Small Hydropower Technology

Natel Energy has developed a new small hydropower turbine technology that offers an environmentally friendly and compact, modular hydro generation system.