PRESS

Natel Energy Q4 2021 Newsletter

January 5, 2022

Looking back on the past year and forward to the next, our team has a lot to be thankful for, and a lot of work ahead. For Natel, 2021 was a year of validation — bracketed by certifying our Freedom Falls plant as a Low Impact Hydro Installation at the start of the year, and by a suite of successful through-turbine fish passage tests in collaboration with Kleinschmidt Associates and Pacific Northwest National Lab in Q4 2021. Partnerships like these underscore our commitment to prioritizing positive ecological outcomes alongside reliable, renewable energy production.

More Stories

Press

Bill Malus to Onyx on Why Natel, both for the hydropower industry and for his career

Natel CEO Bill Malus talks to Onyx about how FishSafe™ turbines deliver exceptional fish passage survival without sacrificing efficiency and how his daughters convinced him to join us.

Press

Protecting eels and generating hydropower: understanding the interplay

The NHA's Powerhouse published an insightful article by VP of Public Affairs Kate Stirr discussing the challenges and solutions to ensuring safe passage for eels through operating hydropower plants.

Announcements

Patriot Hydro selects Natel to conduct feasibility study for FishSafe™ retrofits at Garvins Falls

Natel Energy is announces the commencement of a feasibility study conducted for Patriot Hydro for retrofitting the Garvins Falls Hydropower Project with Restoration Hydro Turbines (RHTs).