

Natel develops detailed hydraulic designs to install new and upgrade existing hydropower plants with high-performance, FishSafe™ turbine runners. Our designs preserve or enhance turbine performance, ensure effective fish passage, and support environmental compliance. We offer:
Our process begins with understanding client goals, followed by developing and analyzing preliminary designs, collaborating with clients to discuss findings, and delivering a concise report summarizing results and recommendations. Initial feasibility studies can be completed in 3-6 months.
Natel’s pumped hydraulic test facility in Alameda, California enables physical testing to complement our CFD modeling and analysis. The facility supports:

Once a feasibility study confirms the design path, Natel works with our manufacturing partners to finalize turbine specifications, coordinate commissioning, and validate hydraulic performance and fish passage outcomes at the installed project.



